Freight Wagon Performance (MG-East & West Zone Combined) Bangladesh Railway
www.railway.gov.bd Hit Counter : 43479 Home |Admin | Contact | Information Mirror | History |
All Cadre PMIS

Ministry of Railways

e-Ticket Procedure

Purchase e-Ticket

Freight Wagon Performance( M G - East West Zone Combined )

During the year 2009-10 average daily kilometrage travelled by a freight wagon was 17.3. Unserviceable wagons constitued 21.5 percent of the total number of wagons on line. Year-wise position is indicated below :-

     (Wagons in terms of four-wheelers)
     
 Wagon kilo-   Percentage of    Wagon Kilo-   Net tonne    AverageTurn  
 metres per    average number of  metre per    Kilometres  Round of a  
 wagon day   wagons under or    engine    per wagon    wagon  
 on line    awaiting repairs   hour    day        
   daily to average        Covered      Open  
   total number            
   on line            
 Year                
             
 July- June            
             
 1969-70   29.3 8.1 134 190 10.2   24.2
 1996-97   16.2 18.2 197 173 16.9   9.85
 1997-98   19.7 15.9 209 185 13.7   11
 1998-99   20.9 15.1 205 206 14.4   10.3
 1999-00   23.3 16.3 200 208 14   7.26
 2000-01   16 10.3 282 147 12.8   8.29
 2001-02   14.4 15.3 264 128 13.6   7.31
 2002-03   13.2 10.3 231 131 10.2   7.38
 2003-04   13.2 10.9 244 128 12.3   6.22
 2004-05  11.8 15.6 229 158 13.9   6.04
 2005-06  14.0 10.0 227 112 15.0   5.36
 2006-07  12.2 8.76 273 93 11.9   6.32
 2007-08  10.8 9.97 225 87 14.0   5.22
 2008-09  10.7 5.56 222 91 15.7   5.89
 2009-10  17.3 21.5 231 117 11.8   9.32
 It was calculated on stock available for loading divided by loading on thedivision as well
as loads received from contiguous divisions and foreignrailways.        
Home | History | Mirror Info | Contact | Enquiry Copyright 2008 Bangladesh Railway