Bangladesh Railway
www.railway.gov.bd Hit Counter : 11389 Home |Admin | Contact | Information Mirror | History | Sitemap
All Cadre PMIS

e-Ticket Procedure

Purchase e-Ticket

Freight Trains (Mg Zone-Wise)

During the year 2009-2010, the number of freight trains run in the Eastern Zone on the Metre Gauge totalled 10.934 and those run in the Westen Zone totalled 2,129. The former covered a totalled of 399,742 kilometres and the later 177,346 kilometres. These figures do not include 399,742 and 6,230 freight train-kilometres run on departmental account in Eastern & Western Zone respectively. The goods proportion of mixed train-kilometres were 10,330 Eastern Zone and 87,770 in the Western Zone. Freight wagon kilometres on goods as well as mixed trains were 46,526,394 and 8,958,651 in Eastern & Western Zone respectively. Year-wise position is indicated below:-

   Year    East    West    Metre Gauge
   July-June    Zone    Zone    Combined  
       
 1. Number of freight    2008-09   11,445 2,005 13,450
 train run    2009-10   10,934 2,129 13,063
       
 2. Freight train kilometres    2008-09   906 153 1,059
 (Thousands)    2009-10   909 177 1,086
       
 3. Number of loaded    2008-09   42.1 22.6 38.0
 wagons per train    2009-10   42.0 19.6 37.0
       
 4. Total number of    2008-09   50.9 31.8 46.9
 wagons per train    2009-10   50.6 33.8 46.9
       
 5. Wagon kilometres    2008-09   46,526 7,623 54,159
 (Thousands)    2009-10   46.526 8.959 55,485
       
         
Home | History | Mirror Info | Sitemap | Contact | Enquiry © Copyright 2008 Bangladesh Railway