Coaching Vehicles per Train and Coaching Vehicle-kilometres(MG-Zone-wise) Bangladesh Railway
www.railway.gov.bd Hit Counter : 21900 Home |Admin | Contact | Information Mirror | History |
All Cadre PMIS

e-Ticket Procedure

Purchase e-Ticket

Coaching Vehicles Per Train And Coaching Vehicle Kilometres(Mg)

During the year 2009-10, a total of passenger trains were run on the Metre Gauge with and average of 19.3 coaching vehicles, (Intercity 26.3, Mail Express 17.3 and local 10.9) and 0.32 freight wagons.The total kilometrage travelled by the coaching vehicles on passenger 198185939 Kilometres (Intercity 111664136, Mail and Express 57675887 & local 228845916 These figures do not include 16500 coaching vehicle kilometres run on departmental account and a total of 859622 freight wagon kilometres run on the local trains. Year-wise position is indicated below:-

    (Vehicles and wagons interms of four-wheelers)  
 Average number of vehicles per train   Vehicle kilometres
            (Thousands) 
                 
Intercity  Mail  Local  Total Freight  Intercity  Mail  Local  Total
trains  Express  trains  All  wagons  trains  Express  trains  All 
  trains  trains               
                 
                 
 Year                    
 July- June                  
                 
                 
 1995-96   27.5 16.4 10.9 17.4 0.57 69,482 44,021 37,470 150,973
 1996-97   26.4 17.8 11.3 17.6 0.94 68,622 49,155 40,934 158,711
 1997-98   28.2 17.9 11.1 18.2 1 71,007 48,880 37,668 157,555
 1998-99   29 18.2 11.2 18.8 0.95 87,538 50,217 37,962 175,717
 1999-00   28 16.4 10.9 18.4 0.88 92,005 48,098 36,616 176,719
 2000-01   28.6 17.7 10.2 18.7 0.97 95,638 53,437 35,886 184,961
 2001-02   27.7 17.6 11.1 18.7 0.82 93,854 53,509 39,003 186,366
 2002-03   27.8 18.9 11 19.2 0.68 94,200 58,358 38,290 190,848
 2003-04   26.9 18.5 11.3 18.9 0.75 93,429 56,743 39,750  1,89,922  
 2004-05   25.7 18.5 10.7 18.7 0,68 103413 56982 37259  197654  
 2005-06   26.1 18.9 10.7 19.6 0.66 109575 60729 29928  200232 
 2006-07   26.0 18.8 11.1 19.8 0.71 109172 60806 29945  199923  
 2007-08   26.3 17.5 10.8 19.4 0.35 111130 57720 28982  197832  
 2008-09   26.2 17.1 11.1 19.4 0.31 111630 57186 28846  197662  
 2009-10   26.2 17.3 10.9 19.3 0.32 111664 57676 28846 198186
Home | History | Mirror Info | Contact | Enquiry © Copyright 2008 Bangladesh Railway