www.railway.gov.bd Hit Counter : 25711 Home |Admin | Contact | Information Mirror | History |
All Cadre PMIS

e-Ticket Procedure

Purchase e-Ticket

COACHING VEHICLES PER TRAIN AND
COACHING VEHICLE KILOMETRES(MG)

During the year 2011-2012, a total of passenger trains run on the Meter Gauge with and average of 19.3 coaching vehicles, (Intercity 26. 1, Mail Express 17.2 and local 10.0) and 0.34 freight wagons. The total kilometer age travelled by the coaching vehicles on passenger 209,309,163 Kilometers (Intercity 112,321,091 Mail and Express 68,498,144 & local 28,489,928. These figures do not include 46,530 coaching vehicle kilometers run on departmental account and a total of 867,154 freight wagon kilometers run on the local trains Year-wise position is indicated below:-

(Vehicles and wagons in terms of four-wheelers)

Average number of vehicles per trains

Vehicle kilometers (Thousands)

Year
July-June

Intercity trains

Mail Express trains

Local trains

Total All

Freight wagons

Intercity trains

Mail Express trains

Local trains

Total All

 

 

 

 

 

 

 

 

 

1999-00

28.0

16.4

10.9

18.4

0.88

92,005

48,098

36,616

176,719

2003-04

26.9

18.5

11.3

18.9

0.75

93,429

56,743

39,750

1,89,922

2004-05

25.7

18.5

10.7

18.7

0.68

103,413

56,982

37,259

197,654

2005-06

26.1

18.9

10.7

19.6

0.66

109,575

60,729

29,928

200,232

2006-07

26.0

18.8

11.1

19.8

0.71

109,172

60,806

29,945

199,923

2007-08

26.3

17.5

10.8

19.4

0.35

111,130

57,720

28,982

197,832

2008-09

26.2

17.1

11.1

19.4

0.31

111,630

57,186

28,846

197,662

2009-10

26.2

17.3

10.9

19.3

0.32

111,664

57,676

28,846

198,186

2010-11

26.4

17.2

10.9

19.3

0.33

112,185

66,412

28,912

207,509

2011-12

26.1

17.2

11.0

19.3

0.34

112,321

68,498

28,490

209,309

Home | History | Mirror Info | Contact | Enquiry Copyright 2008 Bangladesh Railway