www.railway.gov.bd Hit Counter : 14906 Home |Admin | Contact | Information Mirror | History |
All Cadre PMIS

e-Ticket Procedure

Purchase e-Ticket

Availability of Rolling Stock

Table-17

AVAILABILITY OF ROLLING STOCK

 

 

Stock Owned

ineffective stock

Stock available for effective service

Percentage of availability to stockowned

 

 

 

 

 

1. Locomotives-

--

--

--

--

(a) Broad Gauge:-

--

--

--

--

Steam

--

--

--

--

Diesel

78

21

57

73.08

Total

78

21

57

73.08

(b) Metre Gauge: -

--

--

--

--

Steam

--

--

--

--

Diesel- -

217

79

138

63.59

Total

217

79

138

63.59

2. Carriages

--

--

--

--

(a) Broad Gauge: -

--

--

--

--

Passenger Carriages,

312

97

215

68.91

Other Coaching Vehicles

12

-

12

100.00

Total

324

97

227

70.06

Meter Gauge :-

--

--

--

--

Passenger Carriages

1,144

257

887

77.59

Other Coaching vehicles

21

2

19

90.48

Total

1165

.259

906

77.77

3. Wagons(in 4-wheelers)

 

 

 

 

(Excluding departmental wagons)

 

 

 

(a) Broad Gauge

2,540

243

2,297

90.43

(b) Meter Gauge

9,460

1,343

8,117

85.80

N.B. Ineffective stock includes stock awaiting condemnation, under or awaiting repairs in shop or lying in traffic yard and sick lines awaiting repairs and stock used as quarters, godowns etc. for Engineering Department.

Home | History | Mirror Info | Contact | Enquiry Copyright 2008 Bangladesh Railway